@KevinCHuber @ChrisMartzWX The same Federal government subsidizing wind and solar controls the Corps of Engineers. I don’t see any problem with building Hydro except graft and corruption.
The Keokuk Hydro plant built over 100 years ago would have been much more difficult than it is today.— Grandpa Woody (@Woody_Grandpa)
Jun 23, 2024
from http://twitter.com/Woody_Grandpa
via IFTTT