Hofstadter’s Law:
• It always takes longer than you expect, even when you take into account Hofstadter’s Law.
Every project costs 2x as much and takes 3x as long – even when you factor this into your projections.
— George Mack (@george__mack) January 16, 2021
from http://twitter.com/george__mack
via IFTTT